Residential · Toronto & GTA

Bathroom renovations

Bathrooms have little room for shortcuts. We plan the demolition, substrate, waterproofing, tile, fixtures, ventilation and cabinetry as one complete assembly.

Request an estimate
Typical scope

What this can include

The final scope is based on existing conditions, access, selections and the work confirmed in your estimate. We separate known work from optional items so the project starts with a clear baseline.

  • Demolition
  • Plumbing coordination
  • Waterproofing
  • Tile installation
  • Vanity and fixtures
  • Paint and accessories
How we plan it

Sequence before speed.

We begin with the space as it exists, confirm the requested result and identify the work that must happen behind the visible finish. Demolition, framing, rough-ins, substrate preparation and installation are organized in the order the project requires.

Throughout construction, progress questions and changes stay tied to the written scope. The final stage is a documented walkthrough for remaining touch-ups and closeout items.

Working sequence

How the scope moves forward.

  1. 01Review layout, ventilation and fixture goals
  2. 02Remove finishes and inspect the exposed conditions
  3. 03Coordinate plumbing, backing and substrate work
  4. 04Complete waterproofing, tile and fixture installation
  5. 05Finish, test and walk through the room
Pricing clarity

What can affect the investment.

Bathrooms depend on the work behind the tile. Substrate condition, waterproofing, plumbing locations and ventilation are reviewed before the visible finishes are treated as final.

  • Room size and demolition
  • Plumbing or layout changes
  • Waterproofing and substrate condition
  • Tile size, pattern and coverage
  • Vanity, glass and fixture selections
Common questions

Plan the next conversation.

Insured and WSIB covered for accountable project delivery.
01How long will the bathroom be unavailable?

The duration depends on demolition findings, inspections, material availability and the selected work. We discuss the likely sequence before scheduling.

02Can I buy my own fixtures?

Yes, when the model, dimensions, delivery date and installation requirements are confirmed before the work reaches that stage.

Ready to discuss the space?

Tell us what you want to change.

Start your estimate