Full home renovations
Whole-home and full-suite renovations demand a clear sequence. We organize the work from the first site review through demolition, rough-ins, closing, finishes and cleanup.
Request an estimateWhat this can include
The final scope is based on existing conditions, access, selections and the work confirmed in your estimate. We separate known work from optional items so the project starts with a clear baseline.
- Existing-condition review
- Demolition and preparation
- Trade coordination
- Framing and drywall
- Flooring and finishing
- Final deficiency review
Sequence before speed.
We begin with the space as it exists, confirm the requested result and identify the work that must happen behind the visible finish. Demolition, framing, rough-ins, substrate preparation and installation are organized in the order the project requires.
Throughout construction, progress questions and changes stay tied to the written scope. The final stage is a documented walkthrough for remaining touch-ups and closeout items.
How the scope moves forward.
- 01Review the existing home and priorities
- 02Build a written scope and sequence
- 03Coordinate demolition, framing and rough-ins
- 04Complete finishes in a controlled order
- 05Walk through deficiencies and closeout
What can affect the investment.
Full renovations are priced from the actual scope. Early decisions about layout, finishes and who supplies each item reduce allowances and make the schedule easier to manage.
- Size and number of rooms
- Layout or structural changes
- Mechanical and electrical requirements
- Cabinetry, fixtures and finish selections
- Access, protection and occupied-home phasing
Plan the next conversation.
01Can the home remain occupied during the renovation?
That depends on the rooms affected, access, dust control and whether essential services remain usable. We discuss practical phasing during the site review.
02When is the schedule confirmed?
A working schedule is discussed after the scope, selections and trade requirements are understood. Material lead times can affect the start and sequence.
Serving the GTA.
Use a location page for local planning notes, then tell us the exact address privately through the estimate process.